濟(jì)南福華建材廠
聯(lián)系人:吳老師
電話:
手機(jī):13864111871
0531-81901300
地址:山東省濟(jì)南市高新開(kāi)發(fā)區(qū)巨野河辦事處山圈村西
濟(jì)南抹面砂漿:外墻水泥砂漿的抹灰如何不空鼓開(kāi)裂?
來(lái)源:http://www.daquanq.com.cn 日期:2025-09-18 發(fā)布人:
抹灰空鼓、裂縫在工程中一直是一個(gè)大家比較關(guān)注但一直沒(méi)有徹底解決的老大難問(wèn)題,今天就從施工工序上分享一些個(gè)措施,以供參考!
Plastering hollowing and cracks have always been a long-standing and difficult problem that people are concerned about but have not completely solved in engineering. Today, I will share some measures from the construction process for reference!
墻體基層處理:抹灰前的基層處理時(shí)抹灰質(zhì)量的關(guān)鍵之一。所以要求必須將基層表面的砂漿殘?jiān)酃浮⒏綦x劑、油漬等清理干凈。針對(duì)不同基層配置不同砂漿,兩種材料交接處,鋪釘鋼絲網(wǎng),再抹底灰。
Wall base treatment: One of the key factors affecting the quality of plastering during the base treatment before plastering. So it is required to clean up the mortar residue, dirt, isolation agent, oil stains, etc. on the surface of the base layer. For different base configurations, different mortars are used. At the junction of the two materials, steel wire mesh is laid and nailed, followed by the application of bottom plaster.
基層表面垂直度和平整偏差過(guò)大,應(yīng)在抹灰前剔平,當(dāng)局部抹灰厚度太大時(shí),要求用1:3水泥砂漿分層抹平,每層厚度應(yīng)在7—10毫米為宜。并應(yīng)該待前一層砂漿凝固后(7—8成干,發(fā)白不宜)再涂抹后一層,以防止已抹的砂漿內(nèi)部產(chǎn)生松動(dòng)。幾層濕砂漿合在一起很容易造成收縮率過(guò)大,產(chǎn)生裂縫、空鼓。
The verticality and flatness deviation of the base surface are too large, and should be leveled before plastering. When the local plastering thickness is too large, it is required to use a 1:3 cement mortar layer by layer to smooth it, and the thickness of each layer should be between 7-10 millimeters. And the next layer should be applied after the previous layer of mortar has solidified (7-8% dry, not suitable for whitening) to prevent loosening inside the already applied mortar. Several layers of wet mortar combined can easily cause excessive shrinkage, resulting in cracks and hollowing.
要求表面較光滑的混凝土墻面應(yīng)剔毛。抹灰前先涂刷一道水泥漿粘結(jié)層,以增強(qiáng)基層的砂漿粘結(jié)能力,又可將浮灰事先粘牢于墻面上,消除砂漿與基層粉塊狀隔離因素,避免裂縫,空鼓。
Concrete walls with smooth surfaces should be roughened. Before plastering, apply a layer of cement paste bonding layer to enhance the bonding ability of the base mortar. The floating ash can also be firmly adhered to the wall in advance to eliminate the isolation factor between the mortar and the base powder block, and avoid cracks and hollowing.
控制工藝流程:外墻抹灰應(yīng)按以下工藝流程嚴(yán)格進(jìn)行:澆水濕潤(rùn)基層找規(guī)矩、貼灰餅,沖筋抹底灰找平24h后彈分格線、嵌分格條抹面層灰起分格條,修分格縫24h后開(kāi)始養(yǎng)護(hù)。
Control the process flow: External wall plastering should be strictly carried out according to the following process flow: water the base layer to make it smooth, paste the plaster cake, flush the reinforcement, apply the bottom plaster and level it for 24 hours, then snap the dividing line, embed the dividing strip, apply the surface plaster and start the dividing strip, repair the dividing joint for 24 hours, and then start curing.
要求抹灰前墻面應(yīng)澆水濕潤(rùn)。磚墻面一般澆水兩遍,滲水深度大約8—10毫米。如果各層抹灰相隔時(shí)間長(zhǎng),抹灰的砂漿已干,也應(yīng)該在底層澆水潤(rùn)濕后抹上一層灰。澆水程度要與施工季節(jié)、氣候和室內(nèi)、室外操作環(huán)境有直接關(guān)系。外墻抹灰,炎夏季節(jié)應(yīng)盡量避免在日光曝曬下進(jìn)行抹灰。
The wall should be moistened with water before plastering. Brick walls are usually watered twice, with a water infiltration depth of about 8-10 millimeters. If the interval between each layer of plastering is long and the plastering mortar has dried, a layer of plaster should also be applied after wetting the bottom layer with water. The degree of watering should be directly related to the construction season, climate, and indoor and outdoor operating environments. Exterior wall plastering should be avoided as much as possible during the hot summer season when exposed to sunlight.
分層涂抹:分遍完成,分層抹灰,5~8㎜厚,采取大工序抹灰作法,濕潤(rùn)墻體,刷素漿,隨刷隨抹灰。即從建筑物檐口至勒腳先抹底灰和中層砂漿,隔日再?gòu)纳现料抡置婊遥@期間應(yīng)加強(qiáng)底灰澆水養(yǎng)護(hù),保持濕潤(rùn)狀態(tài),對(duì)防止空裂效果很好。
Layered application: Completed in layers, layered plastering with a thickness of 5-8 mm, using a large-scale plastering method, moistening the wall, brushing with plain slurry, and plastering as needed. From the eaves to the feet of the building, apply the bottom plaster and middle mortar first, and then cover the surface plaster from top to bottom the next day. During this period, strengthen the watering and maintenance of the bottom plaster to maintain a moist state, which is very effective in preventing air cracking.
本文由 濟(jì)南抹面砂漿 友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊 http://www.daquanq.com.cn/ 真誠(chéng)的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.
This article is a friendly contribution from Jinan plaster mortar For more related knowledge, please click http://www.daquanq.com.cn/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.
手機(jī)站
關(guān)注微信公眾號(hào)
主站蜘蛛池模板:
亚洲精品国产精品av|
欧美怡红院成免费人忱友;|
97人人添人澡人人爽超碰|
国产av永久无码天堂影院|
亚洲精品国产主播一区二区|
国产桃色精品网站|
97人妻视频妓女网|
亚洲人成网站久久久综合|
午夜亚洲国产精品福利|
日韩大片高清播放器|
精品人妻久久久久久888|
国产在线一区二区视频免费观看|
少妇一区二区三区久久久|
欧美熟妇与小伙性欧美交|
国产农村老太xxxxhdxx|
99久久免费只有精品国产|
国产精品美女一级在线观看|
黑人免费一区二区三区|
无码人妻av一区二区三区波多野|
国产av亚洲精品ai换脸电影|
人妻少妇精品系列一区二区|
亚洲自拍系列在线观看|
亚洲性爱区免费视频一区|
少妇精品久久久一区二区三区|
伊人蕉久影院|
国产盗摄老熟女视频一区二区三区|
91九色系列视频在线国产|
91极品尤物在线观看播放|
久久久久亚洲av成人片乱码|
日产a一a区二区www|
国产一区二区三区在线免费观看|
丰满少妇棚拍无码视频|
一区二区三区四区无限乱码在线观看
|
国产亚洲AV片在线观看16女人
|
91久久精品无码人妻系列|
亚洲 欧美 另类图片|
A级毛片高清免费视频播放出要看|
亚洲AVAv电影AV天堂18禁|
欧美日韩激情在线一区二区|
久久天天躁夜夜躁狠狠综合|
久久精品国产欧美日韩99热
|
