抹面砂漿施工后的養(yǎng)護事項
來源:http://www.daquanq.com.cn 日期:2023-05-22 發(fā)布人:
抹面砂漿在施工后需要馬上保養(yǎng),保養(yǎng)需要留意施工時的溫度,在依據(jù)溫度的狀況確認保養(yǎng)時需要準備的材料,此外也是有無需保養(yǎng)的產(chǎn)品,具體保養(yǎng)條件如下所示:
The plastering mortar needs to be maintained immediately after construction, and attention should be paid to the temperature during construction. The materials that need to be prepared for maintenance should be confirmed based on the temperature condition. In addition, there are products that do not require maintenance, and the specific maintenance conditions are as follows:
冬天施工日平均氣溫小于5°C時要按冬天施工并滿足以下規(guī)定:
When the average daily temperature during winter construction is less than 5 ° C, it should be carried out in winter and meet the following requirements:
1.施工前要采取一定的有效措施加熱基礎(chǔ)表層,使其溫度維持在KTC以上,并清理存水。
1. Before construction, effective measures should be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up any stored water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
Before being cooled, the compressive strength of cement-based engineering materials should not be less than 6MPa.
高溫氣候環(huán)境施工施工位置溫度超過37°C,應(yīng)按高溫氣候延緩施工并滿足以下規(guī)定:
If the temperature of the construction site in a high-temperature climate exceeds 37 ° C, the construction should be postponed according to the high-temperature climate and meet the following requirements:
1.施工前24小時采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take effective measures 24 hours before construction to avoid direct sunlight or other radiation heat at the construction site.
2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎(chǔ)和設(shè)備底板的溫度不可超過37°C。
2. Take appropriate temperature reduction measures, and the temperature of the concrete foundation and equipment bottom plate in contact with cement-based engineering materials shall not exceed 37 ° C.


3.濟南抹面砂漿料漿的入模溫度不可超過35°C。
3. The molding temperature of Jinan plastering mortar slurry should not exceed 35 ° C.
4.施工后應(yīng)及時采取補濕保養(yǎng)措施。
4. Moisturizing and maintenance measures should be taken promptly after construction.
施工溫度超過5°小于37°時,基礎(chǔ)施工后無需保養(yǎng)。超過溫度范圍應(yīng)遵循抹面砂漿施工保養(yǎng)方法實行保養(yǎng)。
When the construction temperature exceeds 5 ° C but is less than 37 ° C, there is no need for maintenance after the foundation construction. If the temperature exceeds the range, the maintenance method for plastering mortar construction should be followed for maintenance.
冬天保養(yǎng)需要準備的材料:棉被、薄膜這些材料主要是為了保溫,因為冬天溫度過低,因此需要做好保溫防范準備
Materials that need to be prepared for winter maintenance: cotton quilts, thin films, etc. These materials are mainly used for insulation. Due to the low temperature in winter, it is necessary to prepare for insulation prevention
夏天保養(yǎng)需要準備的材料:薄膜,薄膜主要是為了補濕,預防水分的太早外流造成產(chǎn)品施工內(nèi)部無法牢固。
Materials that need to be prepared for summer maintenance: thin film, which is mainly used to supplement moisture and prevent the early outflow of moisture from causing the internal construction of the product to become unstable.
此外一定要按時灑水,灑水的也是為了補濕,因為在施工后內(nèi)部反應(yīng)需要大量水分。更多相關(guān)事項就來我們網(wǎng)站http://www.daquanq.com.cn咨詢聯(lián)系吧!
In addition, it is important to sprinkle water on time, as it is also used to supplement moisture, as internal reactions require a large amount of water after construction. For more related matters, come to our website http://www.daquanq.com.cn Contact for consultation!
主站蜘蛛池模板:
女同亚洲精品一区二区三|
国产精品国产午夜免费福利看
|
免费一区二区三区视频狠狠|
午夜福利国产精品视频|
噜噜久久噜噜久久鬼88|
中文字幕日本人妻一区|
郯城县|
乱人伦视频69|
在线观看无码av免费不卡网站
|
国产精品反差婊在线观看|
久久国产精品男人的天堂av|
天堂网av在线|
一本久道久久综合狠狠躁av|
人妻无码系列一区二区三区|
临洮县|
亚洲综合伦理|
国产亚洲精品aaaa片app|
亚洲乱码中文字幕综合|
亚洲国产综合专区在线电影|
久久久亚洲经典视频|
亚洲综合伊人久久大杳蕉|
中文字幕日韩人妻一区|
黑人一区二区三区在线|
日韩精品有码在线视频|
久久天堂av综合色无码专区|
国产日韩av毛片在线|
无遮挡高潮国产免费观看|
亚洲av午夜成人片精品|
国产三级高清在线观看.|
国产精品麻豆A在线播放|
亚洲午夜国产片在线观看|
午夜日韩成年人视频在线观看
|
蜜桃一区二区免费视频观看|
青青草欧美|
成人区人妻精品一区二区不卡视频|
亚洲乱码一区AV春药高潮|
亚洲天堂中文字幕君一二三四|
精品国产福利在线视频|
97一期涩涩97片久久久久久久|
久久99一本色道亚洲精品|
亚洲国产一区在线二区三区|

魯公網(wǎng)安備