抹面砂漿施工后的養(yǎng)護事項
來源:http://www.daquanq.com.cn 日期:2023-05-22 發(fā)布人:
抹面砂漿在施工后需要馬上保養(yǎng),保養(yǎng)需要留意施工時的溫度,在依據溫度的狀況確認保養(yǎng)時需要準備的材料,此外也是有無需保養(yǎng)的產品,具體保養(yǎng)條件如下所示:
The plastering mortar needs to be maintained immediately after construction, and attention should be paid to the temperature during construction. The materials that need to be prepared for maintenance should be confirmed based on the temperature condition. In addition, there are products that do not require maintenance, and the specific maintenance conditions are as follows:
冬天施工日平均氣溫小于5°C時要按冬天施工并滿足以下規(guī)定:
When the average daily temperature during winter construction is less than 5 ° C, it should be carried out in winter and meet the following requirements:
1.施工前要采取一定的有效措施加熱基礎表層,使其溫度維持在KTC以上,并清理存水。
1. Before construction, effective measures should be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up any stored water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
Before being cooled, the compressive strength of cement-based engineering materials should not be less than 6MPa.
高溫氣候環(huán)境施工施工位置溫度超過37°C,應按高溫氣候延緩施工并滿足以下規(guī)定:
If the temperature of the construction site in a high-temperature climate exceeds 37 ° C, the construction should be postponed according to the high-temperature climate and meet the following requirements:
1.施工前24小時采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take effective measures 24 hours before construction to avoid direct sunlight or other radiation heat at the construction site.
2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎和設備底板的溫度不可超過37°C。
2. Take appropriate temperature reduction measures, and the temperature of the concrete foundation and equipment bottom plate in contact with cement-based engineering materials shall not exceed 37 ° C.


3.濟南抹面砂漿料漿的入模溫度不可超過35°C。
3. The molding temperature of Jinan plastering mortar slurry should not exceed 35 ° C.
4.施工后應及時采取補濕保養(yǎng)措施。
4. Moisturizing and maintenance measures should be taken promptly after construction.
施工溫度超過5°小于37°時,基礎施工后無需保養(yǎng)。超過溫度范圍應遵循抹面砂漿施工保養(yǎng)方法實行保養(yǎng)。
When the construction temperature exceeds 5 ° C but is less than 37 ° C, there is no need for maintenance after the foundation construction. If the temperature exceeds the range, the maintenance method for plastering mortar construction should be followed for maintenance.
冬天保養(yǎng)需要準備的材料:棉被、薄膜這些材料主要是為了保溫,因為冬天溫度過低,因此需要做好保溫防范準備
Materials that need to be prepared for winter maintenance: cotton quilts, thin films, etc. These materials are mainly used for insulation. Due to the low temperature in winter, it is necessary to prepare for insulation prevention
夏天保養(yǎng)需要準備的材料:薄膜,薄膜主要是為了補濕,預防水分的太早外流造成產品施工內部無法牢固。
Materials that need to be prepared for summer maintenance: thin film, which is mainly used to supplement moisture and prevent the early outflow of moisture from causing the internal construction of the product to become unstable.
此外一定要按時灑水,灑水的也是為了補濕,因為在施工后內部反應需要大量水分。更多相關事項就來我們網站http://www.daquanq.com.cn咨詢聯(lián)系吧!
In addition, it is important to sprinkle water on time, as it is also used to supplement moisture, as internal reactions require a large amount of water after construction. For more related matters, come to our website http://www.daquanq.com.cn Contact for consultation!
主站蜘蛛池模板:
亚洲精品日本|
国产乱人伦AⅤ在线麻豆A|
免费美女黄网站久久久|
亚洲一区二区三区中文视频|
无码中文字幕专区一二三|
a国产精品|
无码aⅴ精品一区二区三区|
国产亚洲精品不卡在线|
开心五月婷婷激情在线|
国产精品亚洲国产|
四虎亚洲国产成人久久精品|
亚洲香蕉中文日韩v日本|
在线成人看片免费播放视频|
丝袜美腿网站一区二区|
99久久精品无码一区二区三区|
AV一本久道久久波多野结衣|
婷婷久久香蕉五月综合|
亚洲tv精品一区二区三区|
国产成年无码aⅴ片在线观看|
2020国产激情视频在线观看
|
在线成人tv天堂中文字幕|
欧美三级在线手机版费观看|
www.yw193|
国产乱子伦农村xxxx|
亚洲男人的天堂精品一区二区|
国产亚洲精品自在久久77|
久久久久免费精品国产|
一区二区无码精油按摩|
日韩一区二区肥|
亚洲精品一品二品av|
国产精品久久自在自2021|
欧美1区二区三区公司|
中文字幕avdvd|
露脸一二三区国语对白|
色综合久久88|
亚洲一区二区三区天码|
精品免费看国产一区二区|
国产又色又爽又黄的视频在线|
国产精品一区二区久久精品不卡
|
天堂三级成人久久av|
国产熟妇搡bbbb搡bb七区|

魯公網安備